Abbott Project Management Playbook
FEP DELIVERABLES – PROJECT LEVEL
CONCEPT PHASE → GATE 2
CATEGORY
Scope, Project Plan
• User Requirement Specifications (URS)* • Basis of Design (BoD)* • Project Execution Plan (PEP)* • 1 st Design Review**
Justification
• •
Statement of Need
Cost – Benefit Analysis
Alternatives
Alternative Analyses with Recommendation
Site Analysis
•
Site Analyses & Final Selection
• Office Space Selection Security Guidelines – Identify key stakeholders and functional representatives – Provide preliminary drawings – Collaborate with Global Security to complete physical security assessments towards concept
Process, Equipment, Plans, Layout
•
Process Flow Diagram (PFD)
• Building Plans, Elevations, & Sections • Plant / Room Equipment Layouts • Building / Process Equipment List • Utility Load Requirements Cost Estimate with Basis of Estimate (BoE)* • Estimate Allowance: 15-20% • Estimate Accuracy: +/- 25% • Estimate Verification**
Cost
Schedule
Project Schedule Level 2 with Basis of Schedule (BoS)*
Risks
• Level 2 Risk Register* with mitigation strategies • Monte Carlo Simulation**
Regulatory
• • • •
Regulatory Requirements Permitting Requirements*
FM Requirements EHS Requirements*
Energy & Environmental Checklists & Assessments
• Energy / Environmental Assessment* • Green Building Assessment*
• • •
PDRI-1*
Value Improving Practices*
Lessons Learned*
Execution
• Planning for Project Execution Guideline (PEG) Requirements
Others
• Corporate Branding Requirements* • BTS/IT Interface* • Procurement - Project Sourcing Plan*