Abbott Project Management Playbook
FEP DELIVERABLES – PROJECT LEVEL
PRELIMINARY DESIGN PHASE → GATE 3
CATEGORY
Scope, Project Plan
• User Requirement Specifications (URS)* • Basis of Design (BoD)* • Project Execution Plan (PEP)* • Design Review Verification**
Justification
• •
Statement of Need
DCF / ROI*
Process, Equipment, Plans, Layout
• Piping & Instrumentation Diagram (P&ID) • Building Plans, Elevations & Sections • Plant / Room Equipment Layouts • Building / Process Equipment List • Utility Load Requirements Cost Estimate with Basis of Estimate (BoE)* • Estimate Allowance: 7.5 – 15% • Estimate Accuracy: +/- 10% • Estimate Verification**
Cost
Schedule
Project Schedule Level 3 with Basis of Schedule (BoS)*
Risks
• Level 2 Risk Register* with mitigation strategies • Monte Carlo Simulation**
Regulatory
• • • •
Regulatory Requirements Permitting Requirements*
FM Requirements EHS Requirements*
Energy & Environmental Checklists & Assessments
• Energy / Environmental Assessment* • Green Building Assessment*
• •
PDRI-2*
Value Improving Practices*
• RCE Checklists (Security, EH&S, Quality) • Lessons Learned* (If not done at Gate 2) • Global Security Requirements - Provide revised drawings and updated plan - Collaborate with Global Security to complete physical security assessments towards Preliminary Design
- Conduct Kick Off Meeting - Adjust SOW, Design & Cos
Execution
• Planning for Project Execution Guideline (PEG) Requirements
Others
• Corporate Branding Requirements* • BTS/IT Requirements* • Procurement - Project Sourcing Plan*
*Standardized toolkit available **Only for projects with Facilities, Utilities, Infrastructure (FUI) ≥$5MM