Abbott Project Management Playbook
8.3 PEG S CALABILITY •
The Project would not need to have a new building or building expansion to apply the PEG principles. It is important to note that the PEG applies to any Abbott Project that has received RCE approval, including projects that mainly involve design, procurement, installation, and validation of manufacturing equipment. The PEG can also apply to projects involving IT applications, equipment, and infrastructure. • Based on type of project, experience of team, similar project history, and on project needs
PEG Scalability
Useful Links
PEG Template (Management Plan & Assessment C/L)
Project Execution Guideline IT Specific Templates (Business & Technology Services PMO Processes and Templates Library)
PEG References:
• The PEG contains numerous references to external documents. These documents are referred to in the body of th e PEG and identified as “Reference” and are accessible via hyperlinks in the PEG. These references include examples, forms, reports, tables, standards, specifications, guidelines, checklists, and various other reference documents.
62
Made with FlippingBook Digital Publishing Software